  • COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2012 WORKSHOP
  • Slide 2
  • WELCOME & INTRODUCTION CHARLIE FLYNN DIRECTOR, ENERGY EFFICIENCY JARRETT SIMON MANAGER, PROGRAM IMPLEMENTATION LORETTA BATTLES ADMINISTRATION, COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAMS YOLANDA SLADE PROGRAM MANAGER, STANDARD OFFER PROGRAMS
  • Slide 3
  • INTRODUCTIONS (CONT.) NEXANT TEAM JESSY SHAO KRISTIN KAMM DING LI KAI QIU FRONTIER TEAM KYLE CAFFEY LANI CLARK HOLLY PROSSER
  • Slide 4
  • AGENDA 2011 PROGRAM SUMMARY 2012 PROGRAM DESCRIPTION SUPPLIER DIVERSITY DATABASE Q&A DRAWINGS DATABASE TRAINING (IF APPLICABLE)
  • Slide 5
  • 2011 PROGRAM SUMMARY $5.6M ORIGINAL BUDGET SOLD OUT MARCH 2011 WAITING PROJECTS FROM 2010 NO LIGHTING CAP AGGRESSIVE MARKETING EFFORTS 9 MW GOAL EOY TOTALS $7.3M INCENTIVES RESERVED 15.2 MW REDUCTION 129 PROJECTS SUBMITTED 12 WAIT LIST PROJECTS NOT ACTIVATED 101 COMPLETED PROJECTS 16 CANCELLED PROJECTS
  • Slide 6
  • MEASURE DISTRIBUTION
  • Slide 7
  • CONSTRUCTION TYPE
  • Slide 8
  • SAVINGS METHODOLOGY
  • Slide 9
  • 2011 PROGRAM CONCERNS PROVIDE PROJECT ID NUMBER WITH ALL CORRESPONDENCE REQUEST FOR PRE INSPECTIONS PRIOR TO PA SUBMITTAL MULTIPLE PARTIES INQUIRING ON SINGLE PROJECT EXPIRED BUSINESS CHECKS ON WAITLIST PROJECTS VALID CONTACT NAMES/NUMBERS IN DATABASE RETROFITS ON VACANT FACILITIES 75% OCCUPANCY REQUIRED AT TIME OF POST INSPECTION PROJECT DURATION LONGER THAN 3-6 MONTHS REQUESTING USE OF REMOVED PRODUCTS AT OTHER FACILITES, IE LIGHTS, COOLING EQUIPMENT
  • Slide 10
  • 2012 COMMERCIAL STANDARD OFFER PROGRAM GUIDELINES
  • Slide 11
  • CONTINUING FOR 2012 LED PROJECTS SHALL REQUIRE AT LEAST ONE OF THE FOLLOWING PROVIDED BY PROJECT SPONSORS: ENERGY STAR QUALIFIED NEEP QUALIFIED PRODUCTS LISTING PREVIOUSLY UTILITIES REVIEWED AND APPROVED LED PRODUCT LED OUTDOOR PROGRAM CUT SHEETS, SQUARE FOOTAGE & ALL PERTINENT DOCUMENTS ARE DUE AT THE TIME OF PROJECT SUBMITTAL RECYCLE CERTIFICATES REQUIRED ON ALL LIGHTING PROJECTS
  • Slide 12
  • 2012 KEY CHANGES INCENTIVE RATE CHANGES BASED ON MEASURE TYPE RELAMPING IS ALLOWED AT DISCOUNTED INCENTIVE RATE (30% OF THE NON-LED LIGHTING INCENTIVE) LIGHTING SPREADSHEET UPDATED EFFICIENCY STANDARD LIGHTING STANDARD T8 BECOMES MINIMUM EFFICIENCY REQUIREMENT FOR NEW LIGHTING FIXTURES COOLING ASHRAE 90.1 1999 REPLACES ASHRAE 90.1 1989 AS BASELINE EFFICIENCY
  • Slide 13
  • 2012 INCENTIVE RATES MEASURE TYPE$/KW$/KWH LIGHTING FLOURESCENT, HID, CFL120.04 LIGHTING LED210.08 COOLING DX UNITS240.09 COOLING CHILLER260.11 MOTOR235.09 VFD180.07 WINDOW FILM200.08 WINDOW REPLACEMENT210.08 ROOFING240.09 ALL OTHER MEASURES175.06
  • Slide 14
  • PROGRAM OVERVIEW CNP PROVIDES A SET INCENTIVE PAYMENT TO PROJECT SPONSORS FOR EACH KW AND KWH SAVED PROJECT SPONSORS AGREE TO DELIVER A STIPULATED AMOUNT OF KW AND KWH SAVINGS ALL PAYMENTS ARE BASED SOLELY UPON VERIFIED KW AND ANNUAL KWH SAVINGS EMPHASIS PLACED ON PEAK SUMMER DEMAND SAVINGS MEASURES MUST EXCEED CURRENT FEDERAL MINIMUM EFFICIENCY STANDARD FIRST COME / FIRST SERVED INTERNET APPLICATION ONLY OPEN TO ALL SITES WITHIN CNP ELECTRIC DISTRIBUTION TERRITORY TRANSMISSION CUSTOMERS EXCLUDED (>69 KV)
  • Slide 15
  • POSSIBLE CODES CHANGES POSSIBLE CHANGES ON THE HORIZON FOR 2012 PUCT IS CURRENTLY REVIEWING ENERGY EFFICIENCY RULES AND STANDARDS, DEPENDING ON FINAL RULING, MAY OR MAY NOT BE ABLE TO GRANDFATHER CURRENT PROCESS AND PROCEDURES MANY CONSIDERATIONS BEING CONSIDERED ON THE LOCAL, STATE AND FEDERAL LEVEL, ALL OF WHICH MAY EFFECT: BASELINES DEEMED SAVINGS VALUES INCENTIVE LEVELS PREPARE FOR THE UNKNOWN
  • Slide 16
  • NEW VENDORS SUPPLIER REGISTRATION WWW.CENTERPOINTENERGY.COM/ABOUT/CONTACT/SUPPLIERS WWW.CENTERPOINTENERGY.COM/ABOUT/CONTACT/SUPPLIERS VENDOR REGISTRATION IRS FORM W-9 (EMPLOYER IDENTIFICATION NO.) ELECTRONIC FUNDS TRANSFER AUTHORIZATION EID AND EFT INFORMATION IS VERIFIED BY A.P.
  • Slide 17
  • CONTRACTING PROCESS SUPPLIER REGISTRATION - NEW VENDORS PROGRAM APPLICATION & APPROVAL INTERNAL REQUISITION SUBMITTED & APPROVED SUPPLIER & VENDOR NUMBER VERIFIED CREATE CONTRACT DOCUMENTS STANDARD TERMS AND CONDITIONS CONTRACT EXECUTION PROJECT COMPLETION/VERIFICATION INVOICE & PAYMENT
  • Slide 18
  • PROGRAM ROLERESPONSIBILITIES PROGRAM ADMINISTRATOR OVERSEE THAT PROGRAMS FOLLOW PUCT RULES ADJUST PROGRAM BUDGET AS NEEDED ENTER STANDARD AGREEMENTS WITH THE PROJECT SPONSOR REVIEW, APPROVE OR REJECT PROGRAM APPLICATIONS VERIFY AND INSPECT THAT MEASURES MEET INTENDED PURPOSE ADMINISTER INCENTIVE DOLLARS PROJECT SPONSOR IDENTIFY PROJECT OPPORTUNITIES ACCURATELY IDENTIFIES ENERGY EFFICIENCY MEASURES TO BE INSTALLED MARKETING VERIFY CUSTOMER ELIGIBILITY CUSTOMER IN CNP ELECTRIC SERVICE TERRITORY CUSTOMER DOES NOT RECEIVE TRANSMISSION CLASS SERVICE (CLASSIFIED AS INDUSTRIAL) INSTALL AND DOCUMENT ENERGY SAVINGS CUSTOMER CONTRACT WITH PROJECT SPONSOR ALLOW CNP TO CONDUCT ON-SITE INSPECTIONS INSTALL AND DOCUMENT ENERGY SAVINGS PROGRAM PARTICIPANTS ROLES
  • Slide 19
  • PROJECT SPONSOR REQUIREMENTS PROJECT SPONSORS MUST HAVE: ALL APPROPRIATE LICENSES/CERTIFICATIONS EVIDENCE OF TECHNICAL AND MANAGERIAL CAPABILITIES AND EXPERIENCE EVIDENCE OF FINANCIAL CAPABILITY ADEQUATE INSURANCE REFERENCES
  • Slide 20
  • PROJECT SPONSOR MAY BE: NATIONAL OR LOCAL ENERGY SERVICE COMPANIES (ESCOS) NATIONAL OR LOCAL COMPANIES THAT PROVIDE ENERGY- RELATED SERVICES OR PRODUCTS LOCAL CONTRACTORS COMMERCIAL PROPERTY DEVELOPERS DESIGN/BUILD FIRMS ARCHITECTURAL AND ENGINEERING FIRMS INDIVIDUAL COMMERCIAL CUSTOMERS
  • Slide 21
  • CUSTOMER MAY BE: ANY NON-RESIDENTIAL CUSTOMER TAKING SERVICE AT A METERED POINT OF DELIVERY AT A DISTRIBUTION VOLTAGE (
  • STANDARD OFFER PROGRAM OPEN TO ALL ELIGIBLE PROVIDERS WITHIN THE CNP TERRITORY TRANSMISSION CLASS (>69KV) ARE EXCLUDED FIRST COME, FIRST SERVE ONE YEAR PAYOUT PAYMENTS TIED TO VERIFIED SAVINGS STANDARDIZED TERMS FOR ALL PARTICIPANTS RETROFIT AND NEW CONSTRUCTION MEASURES
  • Slide 46
  • 2012 PROGRAM TIMING REGISTRATION FOR 2012 PROGRAM AVAILABLE 11/30/2011 APPLICATIONS FOR 2012 PROGRAM ACCEPTED 12/14/2011 SUBMIT APPLICATIONS AT 10:00AM CST NO INCENTIVE PAYMENTS FOR 2012 PROGRAM PROCESSED PRIOR TO JANUARY 3, 2012 INSTALLATION REPORTS FOR 2012 PROGRAM DUE NO LATER THAN DECEMBER 1, 2012
  • Slide 47
  • SUBMIT DAY DECEMBER 14, 2011 @ 10:00 AM, CENTRAL TIME **IN ORDER TO SUBMIT YOUR PROJECT, CNP MUST HAVE YOUR DEPOSIT BEFORE DECEMBER 14, 2011!**
  • Slide 48
  • SUPPLIER DIVERSITY
  • Slide 49
  • SUPPLIER DIVERSITY POLICY STATEMENT CENTERPOINT ENERGY, INC. RECOGNIZES THE IMPORTANCE OF MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF. THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS RELATIONSHIPS WITH SUCH ENTERPRISES AND USING INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY IMPROVE BUSINESS OPPORTUNITIES.
  • Slide 50
  • SUPPLIER DIVERSITY CENTERPOINT ENERGY JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; JEWEL.SMITH@CENTERPOINTENERGY.COM STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR (713)207- 3388; STEVE.DUKES@CENTERPOINTENERGY.COM HOUSTON MINORITY BUSINESS COUNCIL CONSTANCE JONES (713)2717805; WWW.HMBC.ORG WOMENS BUSINESS ENTERPRISE ALLIANCE SUSAN REPKA (713)6819232; SREPKA@WBEA-TEXAS.ORG
  • Slide 51
  • DATABASE UPDATES MONITORED BY: FRONTIER & ASSOCIATES
  • Slide 52
  • REGISTER AS A NEW USER
  • Slide 53
  • REGISTRATION FORM
  • Slide 54
  • APPLICATION LANDING PAGE
  • Slide 55
  • PROGRAM APPLICATION SUMMARY
  • Slide 56
  • SUBMIT AN APPLICATION ALL APPLICATIONS SHOULD BE COMPLETE AND ACCURATE AND READY TO BE SUBMITTED SEVERAL DAYS PRIOR TO THE PROGRAM SUBMIT DATE TO ALLOW TIME FOR DEPOSITS TO BE SUBMITTED AND LOGGED.
  • Slide 57
  • SUBMIT AN APPLICATION For example, applications can be submitted for the CNP Commercial program Dec. 14, 2011, at 10:00 AM CST. On the designated submit day, the Submit button for that program will become active after refreshing the screen at the program submit time.
  • Slide 58
  • RANDOM 4-DIGIT NUMBER 1.Enter the random 4-digit number as displayed on the screen in the box provided. 2.Click on the Submit button. This submits the application.
  • Slide 59
  • NEW FEATURE-MY VIEW
  • Slide 60
  • Slide 61
  • Slide 62
  • 2012 EQUIPMENT SURVEYS DOWNLOAD AND USE ONLY THE UPDATED 2012 EQUIPMENT SURVEY FORMS. OLDER VERSIONS WILL NOT UPLOAD. AS IT WAS LAST YEAR, THE LIGHTING FORM WILL BE COMBINED INTO ONE SURVEY FORM FOR EXISTING/NEW CONSTRUCTION AND DEEMED SAVINGS/M&V.
  • Slide 63
  • FRONTIER CONTACTS ENERTREK QUESTIONS LANI CLARK LCLARK@FRONTIERASSOC.COM LIGHTING QUESTIONS HOLLY PROSSER HPROSSER@FRONTIERASSOC.COM
  • Slide 64
  • QUESTIONS?
  • Slide 65
  • DRAWINGS
  • Slide 66
  • CONTACT INFORMATION YOLANDA SLADE PHONE: 713-207-7762 EMAIL YOLANDA.SLADE@CENTERPOINTENERGY.COM LORETTA BATTLES PHONE: 713-207-3543 EMAIL LORETTA.BATTLES@CENTERPOINTENERGY.COM WEBSITE: WWW.CENTERPOINTEFFICIENCY.COM