  • LEAP Transportation Document 2015 NL- 1 as developed February 10, 2015Connecting Washington Projects

    $ in Thousands

    Project Title Leg Dist Fund Total

    Program - Highway Management and Facilities Program (D) 60,000

    1 Euclid Ave Administration Facility Consolidation Project 12 CWA 11,000

    2 Highway System Facilities 99 CWA 49,000

    Project Title Leg Dist Fund Total

    Program - Highway Improvements Program (I) 8,244,170

    3 I-90/Front Street IJR 05 CWA 2,300

    4 I-90/Medical Lake & Geiger Interchanges 06 CWA 23,616

    5 I-90/Henry Road Interchange 04 CWA 26,500

    6 SR 14/Camas Slough Bridge 18 CWA 21,363

    7 US 395/ Ridgeline Intersection 08 CWA 21,000

    8 I-90/Barker Road to Harvard Road 04 CWA 20,890

    9 SR 14/Bingen Overpass 14 CWA 22,834

    10 I-82 West Richland - Red Mountain Interchange 16 CWA 28,081

    11 SR 14/164th and I-205 Widening 17 CWA 35,000

    12 I-5/116th Street Interchange 38 CWA 36,000

    13 I-5 Marine View Drive to SR 528 38 CWA 36,082

    14 I-5/Marvin Road/SR 510 Interchange 22 CWA 34,946

    15 Schouweiler Road Improvements 24 CWA 1,550

    16 SR 305 Construction - Safety Improvements 23 CWA 33,000

    17 I-82/ EB WB On and Off Ramps 15 CWA 34,400

    18 SR 26/Dusty to Colfax - Add Climbing Lanes 09 CWA 11,117

    19 SR 150/No-See-Um Road Intersection - Realignment 12 CWA 6,200

    20 US 12/ Wildcat Bridge Replacement 14 CWA 12,000

    21 SR 107/Chehelis River Bridge Approach and Rail Repair 19 CWA 11,700

    22 I-5/Northbound on-ramp at Bakerview 42 CWA 8,000

    23 SR 502 Main Street Project/Widening 17, 18 CWA 7,666

    24 US 101/N of Salmon Creek Bridge -- Stabilize Slope 19 CWA 7,260

    25 Ridgefield Rail Overpass 18 CWA 7,268

    26 US 395/Safety Corridor Improvements 09 CWA 15,000

    27 SR 14/ Wind River Junction 14 CWA 5,143

    28 SR 28/SR 285, North Wenatchee Area Improvements 12 CWA 19,511

    29 US Hwy 2 Safety 39 CWA 16,989

    30 SR 501/I-5 to Port of Vancouver 49 CWA 6,000

    31 SR 518 Des Moines Interchange Improvement 33 CWA 12,288

    32 I-5 Marysville Interchanges - Improvements 38 CWA 14,000

    33 US 195/Colfax to Spangle - Add Passing Lane 09 CWA 13,573

    34 I-90/WB Shoulder Hardening between Bellevue and Issaquah 05 CWA 71,800

    35 I-5 Flood Protection 99 CWA 79,179

    36 I-5/Mill Plain Boulevard 49 CWA 82,832

    37 SR 529/I-5 Interchange 38 CWA 70,823

    38 SR 3/Belfair Bypass - New Alignment 35 CWA 64,661

    39 SR 510/Yelm Loop 02 CWA 66,787

    40 SR 9/SR 204 Interchange 44 CWA 68,857

    41 I-5 JBLM Corridor Improvements 02, 22, 28 CWA 450,000

    42 US 395 North Spokane Corridor 03, 04, 07 CWA 861,860

    43 I-405 Renton to Lynnwood - Corridor Widening 11, 41, 48 CWA, TOLL 1,239,806

    44 I-90 Snoqualmie Pass - Widen to Easton 13 CWA 426,488

    45 I-5 Federal Way - Triangle Vicinity Improvements 30 CWA 85,000

    46 SR 9/Snohomish River Bridge Replacement 44 CWA 145,607

    47 US 12 near Walla Walla - Complete Corridor 16 CWA 172,707

    48 I-82 Yakima - Union Gap Economic Development Improvements 14, 15 CWA 64,413

    49 SR 167/SR 509 Puget Sound Gateway 25, 27, 30, 31 CWA, CWA-L, TOLL 1,876,906

    50 SR 162 Study/Design 25 CWA 300

    51 SR 28 East Wenatchee Corridor Improvements 12 CWA 50,164

    52 SR 539/Guide Meridian 42 CWA 40,000

    53 I-5/156th NE Interchange in Marysville 38 CWA 42,000

    54 SR 526: Hardeson Rd Interchange in Everett 38 CWA 47,197

    55 SR 520 Seattle Corridor Improvements - West End 43 CWA 1,570,000

    56 SR 520/148th Ave NE Overlake Access Ramp 48 CWA 63,606

    57 I-90/EB Eastgate to West Lake Sammamish Parkway 05, 41, 48 CWA 51,900

    Prepared by Senate Committee Services2/10/2015

    9:21 AM

  • LEAP Transportation Document 2015 NL- 1 as developed February 10, 2015Connecting Washington Projects

    $ in ThousandsProject Title Leg Dist Fund Total

    Program - Preservation Program (P) 1,225,000

    58 Highway System Preservation 99 CWA 1,225,000

    Project Title Leg Dist Fund Total

    Program - Public Transportation Program (V) 75,000

    59 SWIFT II Bus Rapid Transit (Community/Everett Transit) 21, 38, 44 MMA 10,000

    60 Fishers Landing Park & Ride Expansion (CTRAN) 17, 49 MMA 1,100

    61 SR 7 Express Service Tacoma to Parkland/Spanaway (Pierce Transit) 25, 27, 29 MMA 10,000

    62 Northgate Transit Center Pedestrian Bridge (Seattle) 46 MMA 10,000

    63 Spokane Central City Line (Spokane Transit) 03, 06 MMA 10,000

    64 MLK Way/Rainier Ave S I/C Improvements (Seattle) 37 MMA 900

    65 Vancouver Mall Transit Center Relocation & Upgrade (CTRAN) 17, 18, 49 MMA 3,200

    66 Rapidride Expansion Burien-Delridge (METRO) 11, 33, 34 MMA 8,000

    67 Trolly Expansion/Electrification, Madison Route (Seattle) 37, 43 MMA 8,000

    68 East Bremerton Transfer Center (Kitsap Transit) 23, 26, 35 MMA 3,000

    69 Bikeshare Expansion, Kirkland, Bellevue, Redmond, Issaquah (METRO) Various MMA 5,500

    70 Silverdale Transfer Center (Kitsap Transit) 23, 26, 35 MMA 2,300

    71 North Broadway Bus Stop Safety Improvements (Everett Transit) 38 MMA 3,000

    Project Title Leg Dist Fund Total

    Program - Washington State Ferries Capital Program (W) 328,000

    72 Ferry Vessel and Terminal Preservation 98 CWA 200,000

    73 #4 - 144 capacity vessel 99 CWA 128,000

    Project Title Leg Dist Fund Total

    Program - Rail Capital Program (Y) 125,000

    74 Port of Warden Rail Infrastructure Expansion 13 MMA 1,000

    75 West Vancouver Freight Access 49 MMA 1,900

    76 South Kelso Railroad Crossing EIS 19 MMA 900

    77 Palouse Rail Loadout Improvements 16 MMA 300

    78 VACIS Relocation 42 MMA 3,000

    79 Palouse River and Coulee City RR - Rehabilitation 06, 07, 09, 12, 13 MMA 50,000

    80 Port of Moses Lake 13 MMA 20,900

    81 Cascades Corridor Slide Prevention and Repair 99 MMA 33,000

    82 Statewide - Emergent Freight Rail Assistance Projects 99 MMA 14,000

    Project Title Leg Dist Fund Total

    Program - Local Programs (Z) 454,880

    83 Edmonds Waterfront At-Grade Waterfront Crossing 21 CWA 1,250

    84 41st Street Rucker Avenue Freight Corridor Phase 2 38 CWA 36,500

    85 Bigelow Gulch 04 CWA 28,100

    86 41st St Rucker/Ave Freight Corridor in Everett 38 CWA 1,500

    87 32nd/Evergreen Reconstruction 18 CWA 500

    88 SR-203/Coe-Clemons Culvert Replacement 45 CWA 500

    89 East-West Corridor Overpass and Bridge 15 CWA 50,044

    90 Duportail Bridge 08 CWA 38,000

    91 SR 432 Longview Grade Crossing 19 CWA 85,000

    92 Smith Road Improvements 42 CWA 40,000

    93 SR 99 Revitalization in Edmonds 21 CWA 10,000

    94 Orchard Street Connector 42 CWA 10,000

    95 SR 516/Jenkins Creek to 185th Avenue - Widening 47 CWA 13,522

    96 Sammamish Bridge Corridor 46 CWA 8,000

    97 27th Street Extension and Rail Overpass 18 CWA 7,500

    98 Complete SR 522 Improvements-Kenmore 46 CWA 8,500

    99 Thornton Road Overpass 42 CWA 21,000

    100 Covington Connector 47 CWA 24,000

    101 Lewis Street Bridge 08 CWA 26,000

    102 SR 524: 48th Ave W - 37th Ave W Widening 32 CWA 14,864

    103 228th & Union Pacific Grade Separation (City of Kent) 33 CWA 15,000

    104 Harbour Reach Extension 21 CWA 15,100

    Notes to New-Law Transportation Project List

    1 Aging and phasing of project delivery is subject to further negotiation.

    2 $395M toll and $130 local revenue is included in this proposed highway improvement project list.

    3 Fund Detail: CWA- Connecting Washington Account; MMA- Multimodal Transportation Account; CWA-L- Connecting Washington

    Account- Local; Toll- unspecified toll revenue

    Prepared by Senate Committee Services2/10/2015